| Touchscreen Telephones |
Computerised Touchscreen Telephones in Control Rooms
Providing computerised touchscreen telephone system to the District, Metropolitan, Hammersmith & City and Circle Line Control Rooms.
|
| |
| Electronic Service Update Boards (ESUBS) |
Design and Installation of Electronic Service Update Boards
Met SYSTEMS Ltd has been appointed to manage the supply and installation of 200+ Electronic Service Update Boards across the underground network. The ESUB has been designed by Met SYSTEMS Ltd to meet all required industry standards whilst at the same time being of a sleek and innovative design.
|
| |
| Aldgate Customer Information |
Aldgate customer information improvements
Providing signalling control system modifications to improve passenger information, remote monitoring of CCTV system and train departure information to the train driver and Control Centre.
|
| |
| Waterloo & City Line Control Room |
Refurbishment works to CER
Full refurbishment of the Waterloo & City Line Control Room. This includes room refurbishment and redecoration, installation of new cabinets and equipment and the building of a new bespoke desk unit to house PC units and meet the requirements of Human Factors assessments.
|
| |
| Central Line Signalling Control Systems |
Maintenance & Support
Met SYSTEMS were commisioned to provide second-line maintenance and support cover for the Central Line signalling control centre. The scope of the works covers the control centre in addition to line-based assets. |
| |
| Train Identification Systems |
Blackfriars Station Rebuild
Met SYSTEMS are currently undertaking work involving the relocation of Train Identification systems and all associated assets at Blackfriars. This work is being undertaken as part of the ongoing project to rebuild Blackfriars station.
|
| |
| CIS Maintenance Support |
Maintenance and System Improvement Works
A second-line maintenance support contract for passenger information systems on numerous stations on the overground network.
Services include software and hardware upgrade and improvement works to increase asset life and reliability. |
| |
| District Line Control Room |
Relocation of District Line Control Room
Providing new control desk and systems for Long Line CCTV/PA, Traction Earth Detection, Tunnel Telephone, SCADA and other Control & Information Systems. The works also include the full design and implementation works for the control room and equipment room fit-out.
|
| |
| ACCAT - Jubilee Line |
Adhesion Controllers Condition Assessment
Installation of an ACCAT Assessment System on the overground sections of the Jubilee Line.
This data gathering system provides concise prediction information allowing easy access to recommendations made. The application inferfaces with ADAS, the MET Office, remote moisture sensors and train bourne sensors to gather information and make accurate predictions.
|
| |
| Customer Information Displays |
Upgrade of platform and station customer information displays
This project involves the design and installation of new customer information displays on platforms as well as station concourses.
|
| |
| Traction Discharge Monitoring System |
Maintenance & Support
Providing full design, engineering, installation and assurance services for a remote traction monitoring system usitilising a SCADA based system to report the discharge of traction current with the train stabling area of the depot. |
| |
| CCTV Recording |
CCTV Digital Recording Upgrades
CCTV Digital Recording Upgrades around the entire network.
|
| |
| Metropolitan Line Service Control Room |
Full intrusive survey and scheme design works for the full upgrade of the metropolitan Line Service control desk and associated systems. Full implementation of works currently on hold due to the clients budget constraints. |
| |
| Wood Lane Station |
New Wood Lane Station - Hammersmith & City Line
Engaged in the design and assurance works for cable diversion works, required to facilitate enabling works for the construction of the new station. |
| |
| UPS Upgrade Works |
Met SYSTEMS undertook the full design, specification, assurance and implementation of various UPS systems located at a number of London Underground stations and depots. Full remote monitoring was also provided for the ongoing monitoring and fault detection. |
| |
| Remote Positive Train Identification |
Remote Positive Train Identification
In order to deliver service improvements, a remote recognition system to positively identify trains at specified locations was requested by London Underground.
The Remote Positive Train Identification (RPTI) system has been developed to provide the necessary functionality to fulfil the requirement set out by LUL. |
| |
| Hammersmith & City Information Systems |
Customer Information Improvements
Improve passenger information on the Hammersmith & City line at Edgware Road, Paddington (main) to High Street Kensington, Baker Street Station (platform 5) and between Liverpool Street to Baker Street.
|
| |
| White City Development Bus Station |
White City Bus Station Communication Systems
Project Management and Assurance Engineering for all communication systems, including PA, CCTV and site security. Also providing systems integration management with LUL and Shopping Complex Systems. |
| |
| White City Development Sidings |
16 Road Underground Sidings at White City
Management and design assurance works for Central Line Signalling Control System. This included the development of new and modifications to existing systems.
Management for all Communications assets for the new development, including CCTV, PA, Security Systems and Control Rooms for both on site and satellite locations. |
| |
| Jubilee Line Extension Project |
Control and Information Assets
Control Centre, Station SCADA and distributed signaling and power control systems.
Human Factors Integration for station operator systems.
Project Assurance
Asset Commissioning/Handover;
Maintenance Contracts Scope, Spec & Implementation. |
| |
| C&I Support Works |
C&I support works for Tube Lines
Providing full management, project engineering and assurance works for Control & Information Systems development and modification to facilitate line upgrade works to the Jubilee and Northern Line signalling systems.
|
| |
| Central Line Re-Signalling Project |
Management of software design and systems integration
Development and implementation of controlled software & Hardware configuration procedures |
| |
| Hammersmith CCTV |
Installation of CCTV at Hammersmith Station
Installation of new CCTV operations throughout Hammersmith Station.
|
| |